Draft v0.1 is open for comment until January 31, 2027.Tell us what we missed.

People.Place.Purpose.

A rating system for data centers

This draft starts from the community. A data center earns its place when local people share in what it creates, when it is clean, and when the work it does helps them. We score all three, the way LEED scores buildings, so neighbors, councils and engineers can read the same scorecard.

Rebecca Butler and Christina Liebner · Draft v0.1 · November 2026 · For discussion

Three overlapping circles: People, Place and Purpose. Their overlaps are fair footprint, shared prosperity and clean useful compute. Common ground sits in the center. People Place Purpose People Place Purpose Fair footprint Shared prosperity Clean, useful compute Common ground
Select a circle to see its credits.

Community first

The useful question is how a community decides which data centers it welcomes, and which it turns away.

Most stories about data centers start from fear: bills that rise, wells that run low, jobs that go elsewhere, decisions made far away. Those fears are reasonable. A large campus can draw as much power as a small city, use water where it is scarce, and send most of its value somewhere else.

The fears also reach past any one building. People worry that AI will take work without giving any back, that their data will leave town, and that the costs of a changing energy system will land on the households with the least say. A data center is where those worries become concrete. It has an address, a zoning hearing and a fence, so it is where opposition gathers.

This started when we asked ourselves what a data center would look like if it met our communities' needs and values, and what standards we would hold it to. We didn't find anything that covered all our concerns, so we started our own rubric.

It begins with the community. What would residents need to see to welcome a site? A fair share of what it earns, a real voice in what happens next, clean power and water they can trust, and work that helps the people who live there. Each of those can be measured, and data centers differ widely on all of them.

People need a common way to tell these apart. LEED gave buildings a shared language for "green." Common Ground Compute aims to do the same for data centers: a public scorecard that a council member, a utility engineer and a neighbor at the farmers market can all read.

Our bias is toward small, clean, community-owned sites. The rating does not require them, but it is built so they can reach the top, and so that large projects earn their way up with verified commitments.

How the rating works

100 points, four tiers, and a balance rule

9
Prerequisites

Disclosure and basic protections. Miss one and the project is not eligible, whatever its points.

30·30·30
Three pillars, equal weight

People, Place and Purpose each carry 30 points. Ten more sit in the center, for work that ties all three together.

≥12
Balance rule

Higher tiers need a minimum score in every pillar. A project cannot reach Included on clean power alone.

Not rated0–39
Informed40+
Consulted50+
Included60+
Empowered80+
040506080
TierTotal pointsMinimum in each pillarWhat it signals
Informed40–49noneThe community knows what is being built and how it performs. Meets every prerequisite and does real work in at least one area.
Consulted50–596 of 30The community's input shapes the project. Solid in one or two pillars, present in all three.
Included60–7912 of 30The community shares in the benefits and the decisions. Strong overall, with no pillar left behind.
Empowered80–10018 of 30The community has real power over the site and what it does. A leader in all three circles. No credit is mandatory, so leaders get here without perfect scores.

Where the circles meet

Each overlap is a promise a community can check

Fair footprint

People and Place. Clean, quiet, flexible on the grid, and paying its own way, so neighbors are not stuck with the costs.

Shared prosperity

People and Purpose. Local ownership, local services and local data, so the value and the decisions stay close to home.

Clean, useful compute

Place and Purpose. Energy and water go into work that matters, measured as carbon and water per unit of useful work.

Common ground

All three. Ten center points reward integrated design, an open playbook, and an independent survey of what residents actually think.

What each pillar asks for

Plain-language intent first, then the measurable requirement. Thresholds are a conservative first draft for testing, not final values.

People

Who owns it, who works there, and who pays for grid upgrades?
30points

Who benefits and who decides: community ownership and revenue, real decision rights, local and union jobs, and protection for neighbors and ratepayers.

IDCreditRequirementPoints
Prerequisites
PE-P1
Early community engagement
Neighbors hear about it, and shape it, before it is permitted.
At least two public meetings before the permit application, materials in locally used languages, and a published community benefits plan that responds to what was heard.
Measured as: Meetings held, attendance, published plan
Required
PE-P2
Fair construction wages
The people who build it are paid fairly.
Prevailing wage, or the local equivalent, for all construction and installation work.
Measured as: Certified payroll
Required
PE-P3
No cost shift to ratepayers
Other customers do not pay for the site's grid upgrades.
The utility or regulator confirms the project pays the grid upgrade costs attributable to it, through a large-load tariff or equivalent where available.
Measured as: Upgrade costs and who pays
Required
PE-P4
Ownership disclosure
Everyone knows who owns and runs it.
Owner, operator and beneficial owners publicly disclosed.
Measured as: Disclosure
Required
Ownership and wealth
PE1
Community ownership
The community owns a real share.
Equity held by a municipality, cooperative, community fund or local residents. 2 pts: at least 10%. 4 pts: at least 25%. 6 pts: majority, or full public, cooperative or nonprofit ownership.
Measured as: % community equity
6
PE2
Community revenue share
A steady share of income stays local.
Payments to an independently governed community fund. 2 pts: at least 1% of gross revenue, or an equivalent fixed annual payment. 4 pts: at least 3%.
Measured as: % of gross revenue paid
4
Governance and voice
PE3
Community board with decision rights
The community has a real say over what happens next.
1 pt: advisory board with published minutes. 2 pts: board reviews major changes (expansions, new workload categories) and the operator must respond formally. 3 pts: board holds binding approval or veto over defined decisions.
Measured as: Board charter and record of decisions
3
PE4
Public reporting and verification
Results are public and checked by someone independent.
1 pt: annual public report against this rubric. 2 pts: report verified by an independent third party.
Measured as: Report published, verifier statement
2
PE5
Enforceable commitments
Promises can be enforced, and complaints get answered.
2 pts: legally enforceable community benefits agreement with named community signatories. 1 pt: public grievance process with published response times and outcomes.
Measured as: Signed agreement; grievance log
3
Jobs and skills
PE6
Union and local construction labor
Building it creates good local jobs.
2 pts: project labor agreement with building trades unions. 1 pt: at least 20% of construction hours worked by local apprentices or local hires.
Measured as: Agreement; % of hours
3
PE7
Local operations jobs
The people who run it live nearby.
Share of operations staff living within the local commuting area. 1 pt: at least 30%. 2 pts: at least 50%. 3 pts: at least 70%.
Measured as: % of operations staff
3
PE8
Training and apprenticeships
Local people can train into these jobs.
1 pt: funded apprenticeship or training places, at least one per 10 operations staff (minimum one). 1 pt: partnership with a local school or college on curriculum.
Measured as: Trainees per year; partnership agreement
2
Neighbors and affordability
PE9
Affordability benefits
The site helps keep local energy costs down.
1 pt: bill credits or funded grid upgrades that benefit other customers. 2 pts: utility-documented net reduction in costs or rates for other customers.
Measured as: $ and $/kWh impact on other customers
2
PE10
Noise, air, traffic and light
It is a quiet, clean neighbor.
1 pt: property-line noise at least 5 dBA below the local limit, with continuous public monitoring. 1 pt: construction and operations plan for traffic, air quality and lighting, with public reporting.
Measured as: dBA at property line; reported incidents
2

Place

Is it clean, efficient, and easy on local water and the grid?
30points

How the site is built and powered: clean energy hour by hour, efficiency judged fairly for the climate, water, grid flexibility and materials.

IDCreditRequirementPoints
Prerequisites
PL-P1
Metering and public disclosure
You can't manage or trust what isn't measured.
Revenue-grade sub-metering of IT and facility energy at 15-minute or finer intervals, and water at monthly or finer. Annual public report of energy, water, PUE, WUE and emissions.
Measured as: kWh, m3, PUE, WUE, tCO2e
Required
PL-P2
No fossil prime power
The site does not burn fuel to run day to day.
No on-site fossil generation for normal operation. Backup generation limited to emergencies, utility-requested grid support and testing, with run hours and emissions disclosed annually.
Measured as: Generator run hours, fuel use, emissions
Required
Clean power
PL1
Hourly clean energy matching
Power comes from clean sources in the same hours the site uses it.
2 pts: 100% annual matching with clean energy from the same grid region. 4 pts: at least 70% hourly carbon-free energy (CFE). 6 pts: at least 85%. 8 pts: at least 95%.
Measured as: Hourly CFE % = clean MWh matched in the same hour / load MWh
8
PL2
New clean supply and storage
Adds new clean power and storage instead of using up what already exists.
1 pt: contracts for new clean generation in the same grid region covering at least 50% of annual load. 2 pts: at least 100%. +1 pt: on-site or adjacent storage of at least 2 hours at 25% of peak IT load.
Measured as: MW and MWh contracted, commercial operation dates, storage MW and MWh
3
Efficiency
PL3
Climate-adjusted energy efficiency
Little energy is wasted on cooling and power conversion, judged fairly for the local climate.
Annual measured PUE compared with a climate-zone baseline (baselines to be set). 2 pts: at baseline. 3 pts: overhead (PUE minus 1) at least 15% below baseline. 4 pts: at least 30% below.
Measured as: Annual PUE from 12 months of measured data
4
PL4
Useful work and utilization
Equipment is actually used, and the site reports energy and carbon per unit of useful work.
1 pt: publish energy and carbon per unit of useful work by workload class (method to be defined). 1 pt: annual average server or accelerator utilization of at least 40%.
Measured as: kWh and gCO2e per unit of work; utilization %
2
PL5
Heat reuse
Waste heat warms something useful nearby.
1 pt: Energy Reuse Factor (ERF) of at least 0.10. 2 pts: at least 0.30.
Measured as: ERF = reused energy / total facility energy
2
Water
PL6
Water use efficiency
Uses little water, especially where water is scarce.
1 pt: site WUE of 0.5 L/kWh or less. 2 pts: 0.2 or less. 3 pts: 0.05 or less, or closed-loop or dry cooling. In high water-stress basins, 0.2 or less is required to earn any points.
Measured as: WUE in litres per kWh of IT energy; basin water stress
3
PL7
Non-potable water
Does not compete with drinking water.
1 pt: at least 90% of cooling water is recycled, reclaimed or otherwise non-potable, or no water is used for cooling.
Measured as: Share of cooling water by source
1
Grid citizenship
PL8
Flexible load
Can step back when the grid is stressed or dirty.
Verified ability to reduce demand on a utility or grid-operator signal for at least 4 hours. 1 pt: at least 10% of peak demand. 2 pts: at least 25%. 3 pts: at least 40%, or a flexible (curtailable) interconnection agreement. Tested annually.
Measured as: kW reduced, duration, event performance
3
PL9
Grid support and resilience
Helps keep the lights on for others.
1 pt: contracted grid services (such as frequency, voltage or capacity) from on-site storage. 1 pt: islanding capability that can serve designated community critical loads or a public resilience hub during outages, with an agreement in place.
Measured as: Contracted MW; critical load served, hours
2
Materials and lifecycle
PL10
Embodied carbon and hardware lifecycle
A lower-carbon building, and old equipment reused or properly recycled.
1 pt: whole-building life-cycle assessment showing at least 20% lower embodied carbon than a baseline design. 1 pt: at least 90% by weight of retired IT equipment reused or recycled through certified recyclers.
Measured as: kgCO2e per m2 or per kW; % of retired equipment by weight
2

Purpose

Does the work help people, and is their data protected?
30points

What runs there and for whom: capacity for local institutions, public access, data kept local and private, open models, and evidence the work helps.

IDCreditRequirementPoints
Prerequisites
PU-P1
Data protection baseline
People's data is protected by default.
Published data policy; customer and community data not used to train models without opt-in consent; breach notification; access controls.
Measured as: Policy published
Required
PU-P2
Workload disclosure
The public knows, in general terms, what the site is used for.
Annual public summary of hosted workload categories (such as training, inference, storage, crypto or token networks) and each one's share of capacity.
Measured as: % of capacity by category
Required
PU-P3
Acceptable use policy
There are clear rules about what the site will not host.
Published and enforced acceptable use policy consistent with local law, with a way for the community to raise concerns.
Measured as: Policy published; concerns log
Required
Community service
PU1
Community computing capacity
Local institutions get computing they could not otherwise afford.
Capacity reserved free or at cost for local government, schools, libraries and nonprofits. 2 pts: at least 5% of capacity. 4 pts: at least 10%. Unused reserved capacity may be released.
Measured as: % of capacity reserved and used
4
PU2
Public access and digital skills
Residents can walk in, learn and get help.
1 pt: regular free public workshops. 2 pts: staffed public help desk at least 10 hours a week. 3 pts: at least 20 hours a week.
Measured as: Hours open; people served
3
PU3
Local services delivered
Local organizations and small businesses actually use it.
Documented services used by local institutions or small businesses, such as paperwork help, bill assistance or business tools. 1 pt: at least 3 active local users. 2 pts: at least 5. 3 pts: at least 10, with usage reports.
Measured as: Active local organizations; usage
3
Data protection
PU4
Data kept local
Community data stays in the community.
1 pt: local processing offered as an option. 3 pts: community and public-sector data stored and processed on site or within the jurisdiction, including backups and logs.
Measured as: Data locations, including backups and logs
3
PU5
Stronger privacy
Collects and keeps as little as possible.
1 pt: logs kept 30 days or less by default. 1 pt: annual independent privacy audit. 1 pt: no outside data transfer for community services without consent.
Measured as: Retention period; audit findings
3
PU6
Security assurance
Security is independently checked.
1 pt: ISO/IEC 27001 certification or SOC 2 Type II report. 1 pt: controls ready for sector rules that public services need, such as HIPAA.
Measured as: Certification status
2
Beneficial work
PU7
Beneficial workload share
Most of the capacity does work that clearly helps people.
Share of capacity serving workloads that pass a published benefit screen (health, education, public services, climate and energy, science, local business), reviewed by the community board. 1 pt: at least 25%. 2 pts: 40%. 3 pts: 55%. 4 pts: 70%. 5 pts: 85%.
Measured as: % of capacity passing the screen
5
PU8
Evidence of outcomes
There is evidence the services help.
1 pt: outcome metrics tracked for community services (time saved, people served, costs avoided). 2 pts: metrics published annually. 3 pts: independent evaluation every three years.
Measured as: Outcome metrics
3
Transparency
PU9
Open and auditable models
People can see which models run community services, and where they came from.
1 pt: published inventory of models used for community services, with source, license and evaluation results. 1 pt: at least 50% of community services run on open-weight models with documented provenance.
Measured as: Model inventory
2
PU10
Tenant transparency label
Each major tenant's use is labeled, like a nutrition label.
A label for each major tenant or workload showing operator, purpose category, model provenance and data practices. 1 pt: available to the community board. 2 pts: public.
Measured as: Labels published
2

Common ground

Do all three circles work together, and do residents agree?
10points

Credits that only make sense across all three pillars, including a measured check on whether residents are actually satisfied.

IDCreditRequirementPoints
Integration
C1
Integrated community design
The community helped design it across all three circles.
1 pt: co-design process covering one or two pillars before schematic design. 2 pts: covering all three, with documented changes made from community input.
Measured as: Process record
2
C2
Measured community satisfaction
Residents say the site has been good for their community.
Independent, representative resident survey each year after operation starts. 1 pt: at least 55% favorable. 2 pts: at least 65%. 3 pts: at least 75%.
Measured as: % favorable
3
C3
Open playbook
Other communities can copy what worked.
1 pt: publish design and costs. 2 pts: also publish performance data and contract templates.
Measured as: Published materials
2
C4
Innovation
Rewards approaches this draft did not anticipate.
1 pt per documented strategy (up to 3) that substantially exceeds a credit or addresses an issue the rubric does not cover, reviewed by the certifier.
Measured as: Documented strategies
3

How the balance rule sorts projects

Hypothetical scores to test the system, not assessments of real projects. Credit-by-credit scores are in the companion spreadsheet.

Not rated · 22

Typical large proposal

Large campus, annual clean energy matching, efficient cooling, union construction. Little community ownership, local service or data commitment.

People 7/30Place 12/30Purpose 3/30Center 0/10

22 points. Informed starts at 40.

Consulted · 57

Best-practice large campus

Large campus with about 85% hourly clean energy, a flexible interconnection, a strong community benefits agreement and revenue share. Mostly commercial workloads, no community ownership.

People 19/30Place 24/30Purpose 10/30Center 4/10

57 points with at least 6 in every pillar. Included needs 60 points and at least 12 in each pillar.

Empowered · 83

Community energy desk (hypothetical)

Small community-owned site on a clean, community-owned utility, with free public access, local data and a business membership. Less efficient than a large campus, so most of its missing points are in Place. We developed this concept ourselves, so read it as an illustration, not an endorsement.

People 27/30Place 21/30Purpose 27/30Center 8/10

83 points with at least 18 in every pillar.

Try it

Move the pillars and watch the tier

19
24
10
4

Result

57 / 100
Silver

Design principles

Conservative by design

  1. Measured, not modeled.Final ratings use 12 months of operating data. Ratings at the design stage are provisional.
  2. Hourly where it matters.Clean energy and flexibility are counted hour by hour, because annual totals hide the nights and still days.
  3. Balance is required.Minimum scores in every pillar keep a project from buying its way up with one strength.
  4. Disclosure before points.Prerequisites cover transparency and basic protections. Fail one and nothing else counts.
  5. Built on existing standards.ISO/IEC 30134 for PUE, WUE and heat reuse, the GHG Protocol for emissions, and established security and recycling certifications.
  6. Fair to small and large sites.Credits use shares and ratios, so a library-sized site and a large campus are judged on the same terms.
  7. Ratings expire.Sites recertify every three years with fresh data, and points can be lost.
  8. Climate-fair efficiency.Efficiency is judged against a climate-zone baseline, and carbon and water per unit of useful work lead, so sites can be built where people live.

What gets rated

The site, as it operates

The rating covers one site: the facility, its owner and operator, and the work it hosts. A green building with poor data practices scores well in Place and poorly in Purpose, and the balance rule keeps it out of the top tiers.

A separate label for AI tools could come later. Like a seafood buying guide with green, yellow and red picks, it would help cities choose applications. That is a companion project, not part of this rating.